Case Study

Mill Ave Water Main Replacement

Mill Ave Water Main Replacement

Pages 1 Pages

Mill Ave Water Main Replacement Location: Amherst, Ohio Pipe Used: 8 inch C909 Quantity of Pipe: 2800 feet Type of Project: Water Main Replacement Duration of Project and Installation: 11/1/12 thru 12/30/12 Additional Comments: Replacing a 4 inch cast iron line that had inside tuberculation causing a flow comparable to inch and a half pipe. Project Profile 12/27/2012