Case Study

MID-CONNECTICUT

MID-CONNECTICUT

Pages 3 Pages

OUR PLANTS MID-CONNECTICUT MID-CONNECTICUT Mid-Connecticut is a 90 MW  2,800 tons per day Energy from Waste (EFW) facility in Hartford, CT. NAES DELIVERS DRAMATIC RESULTS IN SAFETY, COST, RELIABILITY AT MIRA FACILITY SINCE NAES TOOK OVER OPERATIONS, CONNECTICUTS WASTE-TO-ENERGY FACILITY HAS SEEN ABRUPT IMPROVEMENTS IN ITS RECORDABLE INJURY RATE, DISPATCH RELIABILITY, COST CONTROL AND PROCESSING RATE Connecticuts Materials Innovation and Recycling Authority (MIRA) facility presents a triple challenge to an operator, in that its three discrete units  a Waste Processing Facility (WPF), a Power Block Facility (PBF) and an auxiliary Jet Turbine Facility (JTF)  each require DETAILS LOCATION Hartford, CT OWNER Connecticut Resources Recovery Authority TYPE Municipal Waste FACILITY SIZE 90

Join for free to read