Case Study
Microsoft West Building 96, redmond, WA
MICROSOFT WEST BUILDING 96, REDMOND, WA PROJECT SNAPSHOT The LATICRETE ® SUPERCAP ® System was chosen by flooring contractor Division 9 for Microsoft buildings 97 & 96. Our challenges included correcting a substrate rainout issue, providing moisture mitigation with Aquafin SG3 and encapsulating the SG3 with LATICRETE SUPERCAP. We were also asked to achieve a floor flatness requirement of 50. No Problem! The area consisted of 21,000 squa