Case Study

MICROPILES

MICROPILES

Experienced Geotechnical Contractors helitechccd.com 1-800-246-9721 EARTH SHORING GROUND IMPROVEMENT DEEP FOUNDATIONS VIBRATORY STONE COLUMNS MICROPILES GROUTING PROJECT CASE STUDY Sector: Large Residential Apartment Complex Description The existing building was constructed in 1936 and replaced the previous school the previous school building that had opened in 1883. The present 3 – story building was constructed using a concrete frame with concrete block and brick masonry. The foundations consists of shallow column footings connected by grade beams. The east end of the building has experienced considerable distress and cracking, with settlement of approximately 9 inches. The present building was being converted from a school to an apartment building. Requiremen

Join for free to read