Case Study
Microguide Delivers Optimal ESP Placement - Increases Production From 390 To 600 BOPD
A Major Middle East Oil Company had installed an ESP at 5,800 ft MD, after drilling a side track. The ESP only produced ~390 BOPD for a few days, then dropped down to 0 BOPD. Further investigation into the wellbore's condition was required prior to conducting a workover operation as it was suspected that the cause of the poor production could be attributed to insufficient submergence of the ESP. The original shallow location was selected due to the high dogleg severity (DLS) of 5-7 deg/100 ft of the 7 inch liner deeper in the well. (indicated below by the conventional MWD survey). CASE STUDY ? APPLICATION ? LOCATION - MicroGuideTM - High Density Well Logging - Artificial Lift (ESP Placement) - Maximizing Production - Middle East ? TECHNO