Case Study

Metropolitan At The 9

Metropolitan At The 9

Pages 1 Pages

Customer Challenges • Clearly capture data and reporting capability to simplify management • Improve operational efficiencies • Incorporate existing office spaces, a landmark structure and new construction into a mixed use facility EcoSmart Energy Savings The building where Metropolitan at the 9 now stands was originally constructed in 1906 as a bank. In a project referred to simply as The 9, it was completely renovated in 2014. The 9 has been converted into an upscale downtown space offering hotel, apartment and condominium living. As part of their renovation, Metropolitan at the 9 chose the EcoSmart platform as their energy management solution. In total, EcoSmart controls energy consumption in 376 individual living spaces. EcoSmart is expected to save approximately $30,000 annua

Join for free to read