Case Study
MetroLink Extension
The ambitious eight-mile extension of the St. Louis, Missouri MetroLink commuter rail system required massive earth moving and extensive retention solutions. Keystone’s superior strength, cost-competitiveness and speed of installation made them the right solution for this complex project. Project designers chose Keystone Compac Straight Face with a high-strength mix- manufactured by Kirchner Block & Brick, Inc. in Bridgeton, Missouri. The K