Case Study

Meters Woodside_A4

Meters Woodside_A4

Pages 1 Pages

Objectives • Ormen Lange’s prolific reservoir capacity in terms of permeability, size and pressure led to the selection of a big bore, high flow rate completion design concept • The completion design featured a 9 5 /8” production liner and a high-set production packer, which resulted in the cabled permanent gauge (PDG) being located around 1,000-1,200m above the producing sandface • In drawdown constrained wells it is critical to be able to measu

Join for free to read