Case Study

METAL MUNCHER AMT performed washover test, reduced rig time by 92%

METAL MUNCHER AMT performed washover test, reduced rig time by 92%

Pages 2 Pages

METAL MUNCHER AMT performed washover test, reduced rig time by 92% Challenges ? Remedial well application ? Customer requested test to see if the Baker Hughes GT LOK- SET plug could be washed over to be removed from wellbore Results ? Reduced rig time by 92% ? Saved equipment cost by using one washover shoe instead of five for the same operation An overseas customer requested Baker Hughes, a GE company (BHGE), conduct a test to prove a 9 5/8-in. GT LOK-SET TM retrievable bridge plug could be washed over as a last resort retrieval method in a remedial well application. A similar operation had been performed earlier in the same region for a 10 3/4-in. GT LOK-SET retrievable bridge plug that was stuck in hole and required being washed over to retrieve. That oper

Join for free to read