Case Study

Mersey Gateway Bridge

Mersey Gateway Bridge

Pages 4 Pages

Mersey Gateway Bridge Case Study Analysis of an illustrative design of a 3-tower cable stayed bridge Line beam modelling to investigate global e?ects Staged construction analysis of a single tower to prove the design Ramboll was appointed Lead Consultant and Project Manager by Halton Borough Council to carry out a route identi?cation study and illustrative design for a new crossing of the River Mersey in the UK. To assist with its development of the proposed new bridge Gi?ord used LUSAS bridge analysis software to carry out analytical studies to prove its draft design. Overview The Mersey Gateway Bridge is part of a £431million project to ease signi?cant congestion currently experienced by residents of the towns of Runcorn and Widnes in Cheshire, UK, and to improve the resilience of the re

Join for free to read