Case Study

Meir Tunnel

Meir Tunnel

Pages 4 Pages

Case study Meir T unnel Location Philip Lighting Stoke-on-trent T otalT unnel® T -line“I would highly recommend the installation of the T Line LED system. Since the installation of the T line LED lighting I have reduced my overall maintenance costs, saved a substantial amount of money in energy costs, reduced the carbon footprint and reduced the risks for the operatives.” Paul Diamond, Meir Tunnel Planning Manager Operations, Amey Facts Cus

Join for free to read