Case Study
Megaplex 20 - The District
Megaplex 20 - The District • South Jordan, UT • Spring 2006 • Geofoam Stadium Seating Fill • 340,000 Cubic Feet Architect Jose Sanchez FFKR Architecture Contractor Travis Young Sahara Construction Megaplex 20 - The District Geofoam M • • • • A J F C T S Application 340,000 cubic feet of EPS 15 Geofoam was installed as a light weight void ? ll for stadium seating at the Megaplex 20 movie theatre in South Jordan, Utah. Project Details S