M.D. of Greenview, AB

M.D. of Greenview, AB

Project Profiles Layfield - M.D. of Greenview, AB LOCATION: M.D. of Greenview, AB TIMEFRAME: Oct. – Nov. 2017 SCOPE OF WORK: Freshwater Reservoir PROJECT PARTNERS: Owner: Paramount Resources Engineer: Integrated Sustainability Installation and Materials Supplier: Layfield, Skaps (Geocomposite) Background Information and Challenge When Paramount first wanted to put a Freshwater Pond at this location they ran into a few issues with ground water. To mitigate these issues, the Owner and Engineer designed the pond to have an subdrain drainage layer (Double Sided Geocomposite) between the excavated ground and the Reservoir Liner. The goal of having the subdrain layer down first was to aid the subdrain system with groundwater mitigation and as a bonus provide protective underlay to the reserv