Case Study
MCP Environmental installed access steps to a high voltage pylon for National Grid in Sheffield.
T. +44 (0) 1274 601 021 BE SOCIAL F. +44 (0) 1274 608 158 @MCPEnvironLLP E. office@mcp-environmental.com /mcp-environmental-llp mcp-environmental.com Project Overview MCP Environmental installed access steps to a high voltage pylon for National Grid in Sheffield. National Grid required access steps to facilitate routine maintenance and inspection of the high voltage pylon set in dense vegetation. MCP groundworks included hand digging the ground for 30 sustainable pressure treated timber steps. The works included infilling with 30mm gravel and installing a hand rail. As the site lay on the River Don flood plain it was critical to ensure sufficient drainage to allow surface water to disperse through the hard core and geo tex