Case Study

MAX-BRIDGE bridging solution increased ROP 320% and decreased mud losses 74%

MAX-BRIDGE bridging solution increased ROP 320% and decreased mud losses 74%

Pages 2 Pages

118 167 263 384 0 50 100 150 200 250 300 350 400 450 Year 1 Year 2 Year 3 Year 4 Average ft/day drilled MAX-BRIDGE Results Compared to Conventional Polymer System WITHOUT MAX-BRIDGE WITH MAX-BRIDGE MAX-BRIDGE bridging solution increased ROP 320% and decreased mud losses 74% Results • Increased ROP • Eliminated downhole losses • Improved hole cleaning • Enabled use of rotary steerable system due to improved wellbore stability • Reduced overall drilling NPT and casing requirements Challenges • Reduce losses in highly depleted shale formation • Improve wellbore instability • Provide an alternative to conventional polymer system BHGE solution • MAX-BRIDGE advanced bridging solution • BRIDGEWISE engineering software to formulate the best fluid components As fiel