Maury Street — Houston, TX
MAURY STREET — HOUSTON, TX PROJECT SCOPE Vortex Turnkey designed a system to bypass the flow of a 132” sanitary sewer, over 600 ft. in length, to allow the contractor access to the line for a complete rehabilitation. A small land bridge was also constructed to allow children from the neighborhood to safely walk to and from their school, which was located on the opposite side of the sewer line under repair. TOTAL LF: 4,800 ft. (Eight 18”