Case Study

Masterplan to double production capacity

Masterplan to double production capacity

Pages 1 Pages

its manufacturing capacity and turned to Miebach Consulting to create a site masterplan for the extension of an existing plant. A material flow study was conducted which led to several design options. A comprehensive simulation of scenarios supported by Miebach’s in-house engineering tools enabled the selection of the best option. Finally, a detailed layout plan and an execution strategy were developed. Generate possible scenarios in terms of structure, processes and equipment Recommend best masterplan scenario for client-specific requirements Define production logistics and facility traffic Doubled production capacity without increasing original factory area Enabled JIT production and filling logistics Optimized factory traffic flow Project Summary Due to growth, a chemical company was on

Join for free to read