Case Study

Marks and Spencer

Marks and Spencer

PREFABRICATED BOILER PLANTROOM CASE STUDY 00 CAS designed and manufactured a prefabricated boiler plantroom for the new Marks and Spencer’s store in Longbridge. The final solution featured the following services: ? A modulating gas fired boiler with an output of 380kW. ? A single head LTHW circulating pump. ? A vacuum de-gassing unit complete with a 450 litre expansion vessel. ? Controls, lighting/emergency lighting and small po

Join for free to read