Case Study

Manufacturing / Reverse Engineering

Manufacturing / Reverse Engineering

Pages 2 Pages

Antron Cuts Reverse Engineering Time in Half with the FaroArm Flexibility, diversification, and the continued renewal of technology has always been a constant goal at Antron and they are committed to the use of new technology as a means to bring cost savings to their customers. “The time savings we have realized have been a great value to us,” said Engineer Don Clifford. “I would estimate that the FaroArm has cut our engineering time by 50

Join for free to read