CASE STUDY - EDUCATION Manchester Metropolitan University Sir Kenneth Green Library Refurbishment Find out more at morrisandspottiswood.co.uk VALUE £1m ENVIRONMENT QUALITY HEAL TH & SAFETY DURATION 13 Weeks LOCATION Manchester SCALE 37 ,000 Student Facility The project involved the extensive refurbishment and fitout of the Manchester Metropolitan University’s library. The extensive works had to be completed to a very tight schedule and presented a number of technical and logistical challenges. In particular, the library was operational throughout the project, which required detailed planning to keep any disruption to a minimum. The prestige and scope of the job reflected MMU’s status as the largest campus-based undergraduate University in the UK. DELIVERY Extensive pre-planning