Case Study
Manchester Airport
AIRPORT LIGHTING MANCHESTER AIRPORT MANCHESTERPROJECT OVERVIEW • Over 3000 Gamma luminaires were installed in the Terminal 1 building • Sysion Midi RF and RE luminaires were chosen for their energy saving qualities and range of lumen outputs, which provided the required lux levels under the various ceiling heights, as well as their visual appeal • Controllability was a key factor in the project, especially