Case Study
Manchester Airport, Manchester, Great Britain, 2016
Manchester Airport, Manchester, Great Britain, 2016 The LOYTEC Competence Center Calon in cooperation with the company Building Environment Control integrated a modern DALI lighting system with constant light control and occupancy detection in the Manchester Airport’s Terminal 2 already in 2013. In further project stages, the very same lighting control solution has been extended to the public areas of the airport’s terminals T1 & T3, with the aim of further reducing energy consumption following the site wide replacement of the existing luminaires to a full LED solution. The project included the installation of DALI occupancy and DALI daylight sensors in all areas, this coupled with field intelligent processors, would enable lighting loads to be shed when areas were unoccupied. By in