Case Study

Malta Dry Dock

Malta Dry Dock

Pages 1 Pages

Client : Malta Dry Dock Sector : Marine & Shipyards Location : Cospicua, Malta MALTA DRY DOCK Client Requirement As part of its planned re-commissioning, the newly refurbished heavy lifting vessel, the Fairmont Fjord, underwent a 6.8MVA load test on its three new Wartsila type 32 generators (3 x 3,690kW) for an eight week period. Crestchic was called in to provision the load test using low and medium voltage cabling at Malta’s dry docks. An

Join for free to read