Case Study

Malaysian LNG Plant to Use GSE Operator Training Simulator (OTS) Prior to Plant Commissioning

Malaysian LNG Plant to Use GSE Operator Training Simulator (OTS) Prior to Plant Commissioning

Pages 2 Pages

Through our partnership with Emerson Malaysia, that was named the main automation contractor by the project’s engineering procurement contractor JGC, GSE will be delivering a full-scope of the OTS to PETRONAS, Malaysia’s fully integrated petroleum company. The full-scope simulator was required as part of the expansion of the PETRONAS LNG Complex in Bintulu, Malaysia, one of the world’s largest LNG production facilities in a single locatio

Join for free to read