Case Study

Major Pharmaceutical Distributor LOW CAPEX Order Assembly

Major Pharmaceutical Distributor LOW CAPEX Order Assembly

Pages 1 Pages

Major Pharmaceutical Distributor LOW CAPEX Order Assembly Location: Northern Mississippi Project Challenge Client wanted to improve the overall efficiency of their operation and reduce requisite supervision and head count in the operation. Additionally, the client was looking to increase capacity and system throughput, process orders same day, and decrease the overall footprint of the operation all with

Join for free to read