Case Study
Maitland Pool Upgrade
8 The people of Maitland, New South W ales, can now enjoy year-round swimming at their local Swim Centre, thanks to the recent upgrade of its poolside facilities. During the winter months of 1997, the Swim Centre’s grandstand was rebuilt and a new solar water heating system incorporated. Design and Construction Steel was chosen for the grandstand’s roof and supports. This meant that off-site fabrica- tion could be maximised with minimal disrupt