Case Study
Maiden of the Mist
Case History CH8022 Install a new fuel line from the top of Niagara Falls to a new dock 200’ below the cliffs on the American side of the Niagara River Niagara Falls, New York Maiden of the Mist Corporation L.P . Ciminelli Dualoy 3000LCX was chosen for its strength and weight. March 2014 Temperature 20-40 degrees F . Pipe was to be installed vertically down an existing elevator shaft. Each piece of pipe was lowered into the shaft and attached to the previous piece using PSX-20 adhesive. The pipe was glued and heat assisted with Chem Cure Paks. Primary testing was done and secondary fittings were installed. Once installed the pipe run was anchored to the wall of the elevator shaft using our Engineering and Piping Design Guide. On the top level of the site, the pipe was conn