Case Study

Magnificent Seven for Landia’s Chopper Pumps in Azerbaijan

Magnificent Seven for Landia’s Chopper Pumps in Azerbaijan

Pages 1 Pages

landiaworld.com ENGINEERED TO LAST No. 446 – Chopper Pumps Magnificent Seven for Landia’s Chopper Pumps in Azerbaijan March 27, 2018 Installed in open lagoons prone to all sorts of unwanted solids, two Landia Chopper Pumps have completed seven years of uninterrupted service at oil refineries in Azerbaijan – without requiring any spare parts whatsoever. Supplied to leading engineering company KaspianLab Ltd (based in Baku), the DG-I pumps from Landia empty lagoons at state oil refineries, where 20 m3/h (approx.) head is required to pump sludge up to a vibrating screen. Elmaddin Ahmadov, General Manager at KaspianLab Ltd, commented: “We have been using the Landia pumps since 2011 but we’ve never had to order spare parts. It is a tough application, but everything is perfect. The

Join for free to read