Case Study

Macau-Coloane

Macau-Coloane

Pages 6 Pages

.2 .Coloane Power Station High Reliability &: Availability, low For the third extension, the Con- Specific Fuel Consumption and a sortium Leader Burmeister &: long Service Lifetime were the de- Wain Scandinavian Contractor termining factors for Companhia A/S carried responsibility for de Electricidade de Macau, CEM plant design &: system engineer- SARL, in their decision, taken in ing, civil and building works, 1985, to extend their generating supply and erection of mechani- .The capacity with 2-stroke low speed cal, electrical, and control diesel units, the first 2-stroke die- systems and test &: commissio- Largest sel units to be installed in Macau. ning of the completed plant. 2-Stroke Low S p eed In February 1996 the second and Mitsui Engineering &: Shipbuild- .final section of the thi