Case Study
Louis Armstrong Int'l New Orleans Airport
Under-slab Insulation SIPs The New Orleans Airport East/West Runway’s nine month, $64 million rehabilitation project included the removal of some exist- ing pavement, repair and replacement of damaged/deteriorated pavement sections, and the installation of a new concrete overlay. EPS Geofoam with Perform Guard ® was selected as a light weight engineered fill material. • EPS Geofoam was utilized to mitigate differential settlements of exis