Case Study

Long Reach

Long Reach

Pages 2 Pages

Becton Becton, UK FACTSHEET Plant capacity and expected performance: • B6-3 Cambi THP • Thermally hydrolyzed Secondary sludge mixed with raw primary sludge • Multi -phased digestion • THP steam from Waste Heat only • 3 MWs electricity • Cake to agriculture cambi.com BECTON Becton, UK LONG REACH Kent, UKLONG REACH, UK The Long Reach project is a first of its kind in the UK. Thames water have selected AECOM as main contractor w

Join for free to read