Case Study

London Underground Station

London Underground Station

Project: London Underground Station Engineer: Jenkins & Potter Flooring Contractor: Lowry Ltd. Products used: Dry4 Screed SBR Bond (Larcem 25) Larsen Dry4 Screed, a shrinkage- controlled, rapid-drying screed was specified by Jenkins & Potter Engineers for the renovation of flooring and watering channels in a London Underground station. The screed was installed bonded using Larcem 25 bonding slurry. The screed's spec

Join for free to read