London Underground, Flood Mitigation Project Independent Category 3 checking of contractor’s temporary works for £30m strengthening works to Northern Line and Bakerloo Line tunnels under the River Thames at Hungerford. Work included checking of major marine structures and lifting and transporting arrangements for precast concrete units up to 450 tonne in weight. Key Features • Short pro gr amme. • Interface with London Underground running t