Case Study

London, Ohio, Wastewater Treatment Plant - Struvite Control

London, Ohio, Wastewater Treatment Plant - Struvite Control

Pages 8 Pages

LONDON, OHIO, WASTEWATER TREATMENT PLANT - STRUVITE CONTROL Dewatering Equipment: Belt Press Issue: Struvite build-up Duration: 35 day product evaluation with a HydroFLOW device - May 11 to June 16, 2016 Objective: Struvite removal without Chemical/Manual/Mechanical assistance STRUVITE SCALE IN AN ANAEROBIC WASTEWATER TREATMENT PLANT CAN LEAD TO GREAT INEFFICIENCY WITHIN THE PLANT OR OPERATION DUE TO CLOGGING OF THE PIPES, PUMPS AND EQUIPMEN

Join for free to read