Case Study
London Conference Centre 8 Floor W/C Refurbishment
London conference centre 8 floor W/C refurbishment This 8 floor conference centre refurbishment project involved the complete replacement of all W/C and showering facilities throughout the entire property, with 2 phases of works requiring completion within 8 weeks. The scope given included stripping out, removal and replacement of cubicles, sanitaryware, hot water cylinders, suspended ceilings, lighting installations, wiring, floor coverings and