Case Study

Logistics Warehouse Dramatically Transformed by Lighting System Upgrade with Flex Lighting Solutions

Logistics Warehouse Dramatically Transformed by Lighting System Upgrade with Flex Lighting Solutions

Pages 2 Pages

Case Study Logistics Warehouse Dramatically Transformed by Lighting System Upgrade with Flex Lighting Solutions Facility 180,000-square-foot Food Grade Warehouse and Distribution Center near the Port of Savannah Key Results • Over 86% Energy Reduction • 100% Reduction of Maintenance Costs • $215,000 Cost Savings over next 10-years • Reconfigured and Redesigned Lighting Layout • Increased Light Levels from 5 Foot-candles to 15 Foot-candles • Increased Safety • Improved Operators Efficiency and Productivity 80% energy savings $21,500 annual energy savings Location: Savannah, GA Application: Warehouse End Customer: Port City Logistics Partner: LED Lowcountry Before the Flex LED lighting upgrade, operators were spending more time pulling orders for customers. Since the retro

Join for free to read