Case Study
Logistically optimized factory -lean by design
Project Summary A leading power tool manufacturer planned to set up a factory to serve the global market. In a holistic approach, Miebach Consulting developed the layout of the entire site including assembly and warehouses as well as administrative buildings and plant infrastructure, taking into account different stages of expansion. The developed solution supported the undertaking of subsequent investments for facilities as late as possible and hence enabled the client in remaining flexible in its operations. Project Scope Dimension and design layout of entire facility Design error-resistant Kanban-controlled assembly supply Create lean principle- based production line layout Benefits Eliminated supply risks through high- production plant structure Optimal service and total cost distribut