Logan Airport Terminal C Ceiling Replacement

Logan Airport Terminal C Ceiling Replacement

Pages 1 Pages

Massachusetts Port Authority (Massport) needed to replace the outdated HVAC system in the Ticketing Hall of Logan Airport’s 45-year-old Terminal C, as well as the 30-year-old interior ceiling, which had inadequate lighting and significant cosmetic problems. The project also included installation of a sprinkler system that Massport had promised to its Fire and Rescue Department. CHALLENGING DESIGN WORK The biggest challenge was designing and lo