Case Study
Lochawe Rail Track Rock Netting Project
Lochawe Rail Track Rock Netting Project2 Lochawe Railtrack, Bute Network Rail Fairhurst Consulting QTS Rail 2 20,000m of PVC Mesh and Accessories 4.8k x 25mm Galvanized ATB Bar, End Plates and ResinThe rail line running between Lochawe and Oban is very important to the local economy. A series of rock falls recently caused disruption to the rail services. Specialist contractors QTS Rail were tasked with protecting the line, whilst allowing train operations to continue. Using night possessions, systematic meshing and rock bolting of the slope was carried out. QTS used Minova Weldgrip Bolts and Resin systems via their rope access teams to achieve rapid support. Sophisticated rail mounted drilling equipment was used where possible, allowing rapid fixing of the anchors securing the mesh.Min