Case Study
Load DynamiX Validates EMC Isilon Solutions to Meet Customer Performance Objectives
Customer Case Study ©2016 Load DynamiX. All rights reserved. “ By using Load DynamiX, our normal testing cycle was reduced from 60 days down to 2 weeks." Paul Timmerman VP, Technology Solutions AdvizeX EMC data center integration partner, AdvizeX wanted to prove that a proposed next generation storage solution - based on EMC Isilon NAS storage systems - would fully meet the performance requirem