LNG Ship Motor Starting Analysis

LNG Ship Motor Starting Analysis

LNG Ship Motor Starting Analysis By Schneider Electric Motor Management Competency Center schneider-electric.com/motor-managementwww.schneider-electric.com/motor-management March 2018 | 3 Contents Executive Summary 4 Case study’s technical aspects 5 The solution and its benefits 6Case context In LNG ship power system where energy efficiency is the major objective in design phase, the generation sources could be sized relatively close to the steady-state load demand. With motors as major loads on such application, the power system engineer and designer has often to deal with the electrical and thermal constraints on the equipment. Therefore the selection of motor starting control is a key task in the design phase, subject to functional, economical and installation constraints.