Case Study

LM80 Laser Level Transmitter Sinter Preparation (Iron ore) Silos Application

LM80 Laser Level Transmitter Sinter Preparation (Iron ore) Silos Application

Pages 2 Pages

Some details of the application at a customer facility: - The silos were all geometrically lined up with common height of 18 meters. - Several conveyors and tripper cars load the silos independently at the same time. - Several of the silos were constantly being filled / emptied at the same time - There is a constant situation of “rat-holing” of the product in the silos. The rat holing at times only leaves a small percentage of the silo

Join for free to read