Case Study

Llanwern Steel Works Redevelopment

Llanwern Steel Works Redevelopment

Pages 3 Pages

Case Study: Llanwern Steel Works Redevelopment Lucy Zodion provides isolator solutions for Llanwern redevelopment Background As part of redevelopment work at the Llanwern Steel Works, a new link road connecting a newly built housing esate was created. Lucy Zodion was appointed by BAM Nuttall to supply products for the sreet lightinginfrasructure for this link road. After working together for more than nine years, BAM Nuttall was confdent in Lucy Zodion’s ability to be able to resolve the technical challenges involved in this project. Solution M4 Magor to Casleton Corridor Enhancement Measures Lucy Zodion worked closely with the contractors to develop a bespoke solution to meet the full specifcation of this complex scheme. The scheme required the use of a 3-phase cable sysem utilising both

Join for free to read