Case Study
Livingston Academy
HIGH SCHOOL CONVERTS TO TANKLESS WATER HEATERS FOR ENERGY SAVINGS Located in Overton County, Livingston Academy High School in Livingston, Tenn., is a public school with approximately 900 students. Operation of the school’s 1970s electric water heater had been draining the school’s funds for a while. It was time for a change. In 2011, the school took steps to replace the older water heater with a more efficient water- heating solution. What