Case Study
Littleport & East Cambs Academy
limited www.xsign.com Following a competitive tender process, we were awarded the contract to design and supply a range of fabricated lettering to the external façade of both the academy itself, and the co-located leisure centre. Each letter was built from marine grade brushed stainless steel with a deep return to increase impact against the build- ing architecture. The lettering was also required to stand off from the cladding which required significant co-ordination between the cladding subcontractor and our in-house design team to ensure suitable supports were in place to secure the lettering to. Following a fast track manufacture period to meet hand over, the lettering was successfully installed to all elevations and is key to informing visitors of their location. Following