Overview Listed Building Underground Generator Installation Location: Liverpool Products and Services Supplied: Standby Generators The Problem Solution As the old generator was sited in the undercroft of the building and beneath a pedestrian thoroughfare, the old generator set had to be removed through an aperture in the footpath. shentongroup’s Sales and Marketing Director, Curtis Meek, highlighted how this challenge was overcome; “We were aware that the new 800kVA set would not fit through the same opening, so we arranged to have the aperture sympathetically enlarged. The new set was specially designed such that it could be split apart into engine and alternator. It was then craned into the undercroft, reassembled and manoeuvred into position”. On the delicate nature of the proje