THE HIGH-PERFORMANCE CRITICAL INFRASTRUCTURE COMPANY Easy to Install | Cost Effective to Deploy | Durable for Decades Liquid Terminal Employs Composite Repairs to Restore Jetty Lines to Safety PIPE DETAIL 152-mm (6-inch) Butane Jetty Line 200-mm (8-inch) Propane Jetty Line SUMMARY External corrosion on 152-mm (6-inch) and 200-mm (8-inch) import jetty lines Pit depths in the lines were up to 5.5 mm (0.22 inch) amounting to 70% wall loss Trained local contractors carried out repairs, installing Clock Spring Snap Wrap to restore straight line sections. Clock Spring Snap Wrap repairs were completed in only 30 minutes Pipes with complex geometries were treated with Clock Spring Contour Jetty line safety inspections are routine, and assets regularly undergo evaluation to determine their integrit