Line Pipe Project For PDO In Oman

Line Pipe Project For PDO In Oman

CASE STUDY Project Line Pipe Project For PDO In Oman Location Saih Nihayda - Saih Rawl and Natin - Fahud end USer PDO Oman (Shell related company) contractor Toco Oman comPLetion date 2002 deScriPtion Replacement of a corroded steel pipeline system into an GRE line pipe system. PiPe SYStem The total length of both Epoxy pipe systems were as follows; • 26 Km, design pressure 35 bar at 90°C (hydrostatic test pressure 52,5 bar) • 32 Km, design pressure 40 bar at 65°C (hydrostatic test pressure 60 bar) The pipe and fitting connection for both systems are based on a adhesive bonded system, with an integral taper bell end and an tapered spigot end. Standard pipe length 10 mtr. Average installation time per day 1.000 and 1.200 mtrs. ScoPe Our scope included: • Engineering and system design