Lincoln Center for the Performing Arts Energy Management
CASE STUDY SCOPE As part of a continuing effort to identify opportunities for increased energy efficiency through operational and infrastructure improvements, Edison Energy was contracted by Lincoln Center for the Performing Arts (LCPA) to conduct Energy Management Services (inclusive of an ASHRAE Level II Energy Audit in parallel with building-wide Retro-Commissioning (RCx)). From the project’s outset, Edison Energy’s focus was always two-pronged; first to identify operational efficiency opportunities that leveraged the existing HVAC and control system operational improvements (OPEX - Operational Expenditure Savings) and second to propose capital-based engineering opportunities (CAPEX - Capital Expenditure Optimization), both of which would minimize the energy cost expenditures