Case Study

Limetree Bay Village

Limetree Bay Village

Pages 1 Pages

PROJECT DETAILS: Customer Name: Limetree Bay Refining Project Location: St. Croix, USVI Building Type(s): Modular Dorms/Rec/ Admin/Kitchen/Dining Floor Count: 388 Total Sq. Ft.: ~317,000 New or Used Building: Used Job Type: Sale Project Managers: Danny Pearrow Joel Fenstermaker Kyle Hexom St. Croix, USVI The Limetree Bay Terminals facility consists of approximately 32 million barrels of crude oil and petroleum product storage, idled refinery units with total peak processing capacity of 650,000 barrels per day, a deep-water port with 10 petroleum docks. Vesta Modular teamed with Limetree Bay Terminals to relocate an existing remote accommodations facility from Canada to St. Croix in support of the technical labor needed to restart the ref

Join for free to read